Mesh was engaged for the complex refurbishment in which office space layouts were altered, the existing services were stripped out, and new services were replaced throughout. Given the existing nature of the project and the requirement to keep the warehouse areas operational, Mesh conducted thorough investigation works prior to undertaking the design to ensure the correct services strategies were implemented.