This industrial build involved two new warehouse/distribution centres. Of the two facilities, the larger one (at 10,000m2) included full turnkey fitout for a distribution tenant that required a level of temperature control for the warehouse space to ensure product stability.
This was a multi-faceted project involving ECI contractor and a fast track program. The Mesh team brought a strong focus on developing a clear brief for the developer and the tenant as well as on coordination to ensure delivery within the accelerated timing needs.